Corporation Commissioner inspects Kuruvikaran Salai bridge work in Madurai

875

MADURAI: The construction work going on for high-level bridge coming up at Kuruvikaran Salai in Madurai city was inspected by Madurai Corporation Commissioner Dr.P.Karthikeyan today- 20th January 2022. A high level bridge is being constructed across the river Vaigai causeway at this important Kuruvikaran Salai junction, connecting Anna Nagar and Teppakulam.

The corporation commissioner had instructed the officials concerned to speed up the works related to high level bridge, storm water drain, walkway, railings, electricity lights etc. Among those present during the inspection include Assistant Commissioner (Traffic) Mr.Mariappan, assistant engineer Mr.Thiagarajan and corporation officials.




Leave a Reply